4.13 Thermal Equipment and Pipe Insulation of the Whole Plant
4.13.1 Fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
1 Scope:fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
2 Quality criteria and inspection methods are shown in Table 4.13.1.
Table 4.13.1 fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_677.jpg?sign=1738938971-jRm1EdX3V6GGeqb8GhpMifATX8pC4lJx-0-d6e3a022affc3fb54993e1d7e2a93575)
Table 4.13.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_678.jpg?sign=1738938971-pp9f6cjCagtuKkKODRthDBumbJq5yJqb-0-1e708efbb9348068c91d3eb14fbbefae)
4.13.2 Main insulation wet masonry and outer wall trowel finish surface construction of thermal equipment.
1 Scope:construction of main insulation wet masonry and outer wall trowel finish surface of thermal equipment.
2 Quality criteria and inspection methods are shown in Table 4.13.2.
Table 4.13.2 Construction of main lnsulation wet masonry and outer wall trowel finish surface of thermal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_679.jpg?sign=1738938971-iW7sMXhj5VIZb6m0atVpFMASOfO4eFct-0-6292e0e3b202308707014dd7d65daa8d)
Table 4.13.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_680.jpg?sign=1738938971-S9dUIfrc8UmPvUoFK03oOPzQnqKEMHrv-0-523fecf65dad97867ba67c175ff7d632)
4.13.3 Erection of main insulation masonry of thermal equipment and outer wall metal hood.
1 Scope:erection of main insulation masonry of thermal equipment and outer wall metal hood.
2 Quality criteria and inspection methods are shown in Table 4.13.3.
Table 4.13.3 Main insulation masonry of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_681.jpg?sign=1738938971-VeDOyatQBQVgtikz1PNXHoPhnQRqXW4u-0-8548dc689c6bf7e09b05da6bd73baf84)
Table 4.13.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_682.jpg?sign=1738938971-4BUjmPHQnmcg49Kl4qn6vUZUdfiNFOJm-0-f4be227b93676ca514aa1aae9bf9da8a)
4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood.
1 Scope:insulation of flue gas ducts,hot air ducts and cold air ducts.
2 Quality criteria and inspection methods are shown in Table 4.13.4.
Table 4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_683.jpg?sign=1738938971-laJKXjOoQs8gbWdgUGjolsC6cUbzgMBZ-0-597c8513a3c89ae56968f7209db9f97f)
Table 4.13.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_684.jpg?sign=1738938971-bIWV0WPHmfiy8EMv6e9vDFakf6uGmKzl-0-0fc71db1635fa632bef7aade97a06b42)
4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
1 Scope:construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
2 Quality criteria and inspection methods are shown in Table 4.13.5.
Table 4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_685.jpg?sign=1738938971-gnJFgDSttf3zYTYYKDOgQnsCXA880PRs-0-a9489432f6dcec1ab7b936446252d37f)
Table 4.13.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_686.jpg?sign=1738938971-4XMTxGc37YrLS04iG5beF2vpDav2bKXx-0-71c48285739268e109ca8c0704a92152)
4.13.6 Main insulation masonry of thermal pipes and erection of outer wall metal hoods.
1 Scope:main insulation masonry of thermal pipes and erection of outer wall metal hoods.
2 Quality criteria and inspection methods are shown in Table 4.13.6.
Table 4.13.6 Main lnsulation masonry of thermal pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_687.jpg?sign=1738938971-dRiumWnqUYu5QDbYPsNq5id5dklvGg6y-0-481afab347ef2cf3e13c8f5229112b32)
Table 4.13.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_688.jpg?sign=1738938971-EVPYfYJ5Eo4mvxBjog0J8w3nSC10qOrG-0-ecfad0756b0085954ede290f413f379d)
4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods.
1 Scope:main steam pipes,feed water pipe and reheating steam pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.7.
Table 4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_689.jpg?sign=1738938971-INP0VebE4XS7jVbEo0jJD5sIKTTWE5xf-0-bef181ad6130cd88e429b68f17790714)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_690.jpg?sign=1738938971-lTNKdsnJ4bsNoNBZuYbGeQiFw97YoPCT-0-ec3e13e37eadb50ef1b8c5b80d3c6b95)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_691.jpg?sign=1738938971-yUdYr3yzcvMqxLe6Q18tLsmqCGbO6oj9-0-fe2544a643e419c65dea1797b78e726b)
Note:a—erection of a metal cover at any creep expansion measuring point shall be only applicable for main steam pipe and reheating steam heating section.
4.13.8 Steam turbine proper spraying and insulation.
1 Scope:steam turbine proper spraying and insulation.
2 Quality criteria and inspection methods are shown in Table 4.13.8.
Table 4.13.8 Steam turbine proper spraying and insulation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_692.jpg?sign=1738938971-YMVArilLzFNHbsI4rmaZ2jAsrHrFLDpX-0-977c16049146681eb880f7ddf9c745ed)
Table 4.13.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_693.jpg?sign=1738938971-hRZfIYBkXgtOWcQw3iEHrb1xVhY9rC9n-0-3f5b58d05eb0a8806af295d05375dc57)
4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper.
1 Scope:aluminum silicate fiber felt pasting insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.9.
Table 4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_694.jpg?sign=1738938971-XoNHf4TiUqd6olI30iDdwkAscdcDGUtS-0-5aab6d6f0d3f214b1b574a54a92b4c01)
4.13.10 Mineral fine fiber felt and board insulation of steam turbine proper.
1 Scope:mineral fine fiber felt and board insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.10.
Table 4.13.10 Mineral fine fiber felt and board Insulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_695.jpg?sign=1738938971-pY3PrzT84IhTKiJOPcDHnsKoaH0ltGY5-0-c0fa17cf3aa89a3de8443ba1eea8e3b6)
4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
1 Scope:insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
2 Quality criteria and inspection methods are shown in Table 4.13.11.
Table 4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_696.jpg?sign=1738938971-JxrzRdzAgdoJd89nvsFqRdh16Vxln2cS-0-18783aa54a0452ddc5b6af491c83fc92)
Table 4.13.11(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_697.jpg?sign=1738938971-ZxMg2lMvXuRuRdY10555X8ClwSqoUUwz-0-74ef7275b21dc48010f323d96362392b)
4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes:
1 Scope:insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.12.
Table 4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_698.jpg?sign=1738938971-88Ot73xZY9pvJUVvLq7slfzxPyShcjmR-0-c6edfb81f19b2fc0a8631c4df2570700)
4.13.13 FRP insulation sleeves of valves and flanges.
1 Scope:FRP insulation sleeves of valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.13.
Table 4.13.13 FRP insulation sleeves of valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_699.jpg?sign=1738938971-1H2jHufomDs3ezcXGKRsMfDrkAZhie9X-0-e1182036cf0098428c50b3ae719c2213)
4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges.
1 Scope:insulation construction of metal shells of thermal equipment,pipe valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.14.
Table 4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_700.jpg?sign=1738938971-xVFRdpXSNbz8DfXqGIlkc0RqtkjW8iuo-0-e801638951d1bd61c1e30973e74784d7)
4.13.15 Certification of insulation material sampling and re-inspection.
1 Scope:insulation materials,insulation concrete materials and trowel finish surface materials.
2 The certification of insulation material sampling and re-inspection shall meet the requirements of Table 4.13.15.
Table 4.13.15 Certification of insulation material sampling and re-inspection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_701.jpg?sign=1738938971-vdvKo1NGxmB1bQ8Mpm6Egq9JKNkTySgw-0-f0e0a3dc5c4bb9d57e4ac4b05e8a6e59)
4.13.16 Measurement record of equipment and pipe surface temperature after insulation.
1 Scope:surface temperature measurement to boiler setting,furnace top setting,reheating steam pipes,main steam pipes and the feed water pipes after insulation.
2 The measurement record shall meet the requirements of Table 4.12.12.
4.13.17 Implementation inspection list of mandatory provisions.
1 Scope:implementation inspection of mandatory provisions on insulation subsection project of steam turbine equipment and pipes.
2 The implementation inspection of mandatory provisions shall meet the requirements of Table 4.13.17.
Table 4.13.17 Implementation inspection list of mandatory provisions
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_702.jpg?sign=1738938971-AyQSU6okegyL2SShrvnpD71xveGeHhFR-0-4a9f5c86fe57bb216c670b0b8c7b3071)
Note:contents in this Table may be added or deleted properly according to actual situations.